Additional information
Electrical Requirements | 240v 3 Phase |
---|---|
Install-Method | Hard-Mount/Bolted In Place |
Drain Method | Floor Drain |
Capacity/Pieces of Gear (separated) | Up to 14 pc capacity |
Capacity: – 70 lbs / 14 pieces, Electrical Configuration: 208-240/60/3/3w+G
Electrical Requirements | 240v 3 Phase |
---|---|
Install-Method | Hard-Mount/Bolted In Place |
Drain Method | Floor Drain |
Capacity/Pieces of Gear (separated) | Up to 14 pc capacity |
Note: you may experience errors as you navigate while we are restructuring our website. Please email us with specific questions at sales@circul-air-corp.com Dismiss