INSTALLATION GUIDE
CIRCUL-AIR HARD MOUNT EXTRACTORS
For Models:
CACHMHD-35
CACHMHD-40
CACHMHD-55
CACHMHD-70
Open attached document for instructions with Images.
Revised 10 June 2025
Copyright © Circul-Air Corporation 2025
Page | 2
Tools Needed
Possible Additional Tools
Drilling Guide
- Hammer Drill (for best results, use a corded drill)
- Masonry Bit as per Drilling Guide
- Wrench or Long Socket as per Drilling Guide
- 8mm Nut Driver
- #1 Philips Screwdriver
- T20 or T25 Screwdriver
- Caulking Gun (if using chemical anchor)
Model Hole Depth Bolt Exposed
Above Concrete
Bolt Size – Head
Size
CACHMHD-35 4”+ 2.5 inches 5/8 inch – 15/16”
CACHMHD-40 4”+ 2.5 inches 5/8 inch – 15/16”
CACHMHD-55 5”+ 2.5 inches 5/8 inch – 15/16”
CACHMHD-70 5”+ 2.5 inches 3/4 inch – 1-1/8”
Copyright © Circul-Air Corporation 2025
Page | 3
- Ensure the area the extractor
will be installed in is free of
debris and any previous
extractor/equipment (including
any mounting hardware or
mortar).
- Remove lower front and back
panel using Torq screwdriver to
access bolts to remove from
pallet and to be able to access
for marking drill holes.
Steps for Installation
Copyright © Circul-Air Corporation 2025
Page | 4
- Use base or extractor to mark
locations to be drilled and the
perimeter of the extractor. Make
sure when positioning unit to
follow manual for recommended
distance left between the rear of
the unit and external structures
or objects to allow for
installation/servicing. - Move base/extractor and use a
masonry bit (for size see Drilling
Guide above) and heavy-duty
drill to drill out holes to listed
depths. For best results, use a
vacuum or compressed air to
remove as much debris from the
hole as possible.
Copyright © Circul-Air Corporation 2025
Page | 5
- Place and secure anchors into
holes. Note: possible delay at this
point if using chemical anchor to
allow anchor to set. - Mix and add small amount of
grout onto footprint of base or
machine, ensuring it does not
make contact with anchor
hardware.
Copyright © Circul-Air Corporation 2025
Page | 6
- Place base over anchor
hardware and affix as per Drilling
Guide. Place machine if not
using base.
- Remove excess grout and
clean base. (Best to do before
the machine is mounted so that
the grout doesn’t dry on the
base.)
Copyright © Circul-Air Corporation 2025
Page | 7
- Place machine on base and
affix with base hardware
provided (2 bolts in the front, 4
bolts in the back). - Reinstall front and back lower
cover.
Copyright © Circul-Air Corporation 2025
Page | 8
- Connect drain to trough or
drain.
- Connect unit to power,
following all regulatory codes in
your area.
Copyright © Circul-Air Corporation 2025
Page | 9
- Build water screens and
attach to machine, then connect
water supply.
- If using pump, install as per
pump install guide.
Copyright © Circul-Air Corporation 2025
Page | 10
- Turn power on and ensure
unit turns on.
Do not run or test machine until a
minimum of 4 hours has passed
since completing step 8.